Technical risk assessment
A risk register earns its place when it separates manageable uncertainty from the blockers that threaten the investment. Record each risk with likelihood and impact, and attach the evidence supporting that judgement so a named owner holds the mitigation and the residual exposure after mitigation. Without the evidence column, a technical risk assessment is just a list of worries ranked by who spoke loudest.
Residual exposure is the figure that matters at approval. If a risk stays high after every mitigation you can afford, that is a finding about the concept rather than a task for the delivery team. The British Airways penalty of £20 million is the kind of consequence that belongs in a register with a cost attached.
Keep the technical risk assessment tied to tested evidence. A risk downgraded because a spike proved the integration works is a real reduction. One downgraded because the team feels better about it is not.
Alternative approaches
Some concepts are possible and still not worth funding. That is the most common outcome worth catching, because it is the one people avoid naming. When the evidence says the original shape is too expensive, compare reduced scope against phased delivery.
Vendor comparison is where a software feasibility study pays for itself. Buying 80% of the capability and integrating it changes the cost profile and the time to first value. Present the options with the same estimate ranges and the same risk treatment, so the comparison is genuine rather than decorative.
Technical feasibility assessment scorecard
Scoring makes the decision reviewable. Weight each area by how much it influences the investment and score it on the evidence you hold rather than the confidence you feel. Agree the weights before the findings arrive so nobody tunes the model to the answer.
A workable weighting for a complex build:
-
Evidence strength, 15%. Has the critical assumption been tested, or only discussed?
-
Architecture and integrations, 15%. Includes API availability and the state of any legacy dependency.
-
Data availability and quality, 10%. Scored against the actual source records.
-
Performance and infrastructure, 10%. Measured under realistic load.
-
Security and compliance, 10%. Controls identified and costed.
-
Skills and operations, 10%. Covers both build capacity and the long-term support model.
-
Cost and schedule confidence, 15%. Ranges with assumptions, not point estimates.
-
Dependencies and technical risk assessment outcome, 15%. Residual exposure after mitigation.
Set the pass threshold at 70% overall with no individual area below 50%, because a strong average hides a single fatal constraint. Treat these as critical failures regardless of total score: no viable integration path to a system you must connect to, or a residual risk whose cost exceeds the expected return.
Sample approval evidence pack
The pack is what turns weeks of investigation into a decision that takes an hour. Keep it short enough to be read in full before the meeting, and put the recommendation where nobody has to hunt for it.
What an approval discussion needs in front of it:
-
A decision summary of one page, with the recommendation stated first
-
The assumptions tested, the method used for each, and the result
-
Prototype, benchmark and integration test findings, including anything that failed
-
The option comparison, with estimate ranges and confidence levels for each option
-
A dependency map showing sequencing constraints and external owners
-
The risk register with residual exposure, and the scorecard against the agreed thresholds
-
Unresolved questions, with the cost and timescale of resolving each one
That last item is the one teams drop, and it is the one that protects you. Naming what remains unknown, and what it costs to find out, is how a technical feasibility assessment supports a conditional approval instead of forcing a binary bet. Every claim in the pack should trace to a test or a measurement.
Make the funding decision
Agree the decision criteria before the evidence lands, then apply them. Five outcomes cover the ground. Go and conditional go are two of them, and pivot and pause are two more. No-go is the fifth. Which one applies follows from the scorecard and the residual exposure in the technical risk assessment.
Conditions have to be tied to something specific. A conditional go releases funding for the first phase while a named integration risk is retired, with a defined checkpoint and a stated cost for the mitigation. A pivot follows when the evidence supports a different architecture or a vendor route. A pause is the right answer when a dependency you do not control has to move first.
No-go deserves more respect than it gets. The NAO identified this pattern across 11 government digital strategies over 25 years, with the same themes recurring because programmes proceeded past the point where the evidence said stop. A technical feasibility assessment that produces a well-argued no has saved you the overrun you would otherwise have funded.
Get targeted evidence
Most investment decisions hinge on two or three uncertainties. Evolved Ideas has spent 19 years building bespoke software for clients including the NHS and Bridgestone, and that work starts by understanding the problem before recommending anything. If you are weighing a significant build and want the riskiest assumptions tested first, talk to our team about a focused technical feasibility assessment.